Our solutions on construction site : Electricity
Our products on construction site : Macro-trenchers
The needs on this site : Rental
Location : 63176 Heume l’Eglise
Location: Heume l’Eglise (63)
Date: July 8–11, 2024Following a modification of their trencher in the Groupe Marais workshops, the client rented an ST2 TRN trencher for the construction of an ENEDIS connection intended to supply future wind farms and strengthen the network in anticipation of increased demand.
The 4,500-meter-long project involved laying four HTA240² EDR cables in a 0.52-meter-wide trench through a mix of schist, shale, and clayey sand.
However, several issues arose, requiring the intervention of a Groupe Marais mechanic to adjust the backfiller — adjustments that did not fully satisfy the client.
The client therefore customized their own backfiller, adding a beam extension, two backfillers, and longer blades to improve material flow over the screener and facilitate cleaning operations.
The first section of the project was carried out using a bottom-trench installation, with the trencher tracks positioned on either side.
Project details:
The machine used was an ST2 double-slider TRN equipped with a 0.52 m cutting wheel.
We proposed a mechanized laying solution with wheel trenching, designed for complex ground conditions, combined with a multi-cable laying system using specially adapted rollers.